*00198814
*00520250613115412.0
*007ta
*008110106s2003 no 000 u eng d
*00900885cam a2200217 c 4500
*019 $bl
*020 $a8270174424$qh.
*035 $a(EXLNZ-47BIBSYS_NETWORK)990318441034702201
*035 $a(NO-LaBS)14015459(bibid)
*035 $a(NO-TrBIB)031844103
*035 $a031844103-47bibsys_network
*040 $aNO-TrBIB$bnob$ekatreg
*1001 $aOberländer, Barbara C.$0(NO-TrBIB)90153517$_28668800
*24510$aFire preparedness measures in buildings with hot laboratories$cB.C. Oberländer
*260 $aKjeller$bInstitutt for energiteknikk$c2003
*300 $a[11] bl.
*4901 $aIFE/KR/E$v2003/005
*500 $a"Presentation at: 41. Plenary Meeting of the EWG "Hot Laboratories and Remote Handling", session 2: Hot laboratory infrastructure, September 22-24, 2003, Saclay Nuclear Research Centre, France"
*830 0$aIFE/KR/E (trykt utg.)$x0333-2039$v2003/005$w998222241434702201$_13909600
*901 $a80
*999 $aoai:nb.bibsys.no:990318441034702202$b2021-11-14T19:48:18Z$z990318441034702202
^